Latest News
Case Study - Fairfield Glade Lift Station Replacement
04/24/2015
Fairfield Glade had massive infiltration and inflow (I&I) issues with a sewage collection system. Current pumps at the lift station could not keep up with rain events and sewage spills were likely during these events. This case describes overall savings realized by installing supplemental pumping capacity without the added costs associated with sizing the main lift station for peak flows.